Before the beginning of assembly prepare all necessary new spare parts, laying and consolidations, and also the following tools and adaptations: 
 – cтандартный tool kit;   – dinamometrichesky natural head 1/2;   – the adaptation for installation of piston rings;   – an opravka for an obzhatiya of piston rings;   – pieces of rubber or plastic hoses for clothing on bolts of a cover of a rod;   – plastic calibration wire of "Plastigauge";   – set щупов;   – file;   – fresh oil for the engine;   – assembly greasing or greasing on the basis of a molybdenum disulfide;   – hermetic;   – a compound for fixing of carving connections. 
To save time and labor costs, assembly is recommended to be carried out in the following order.   – piston rings (see subsection 3.1.2.16);   – a cranked shaft and radical bearings (see subsection 3.1.2.17);   – pistons assembled with rods (see subsection 3.1.2.19);   – a back epiploon of the crankshaft (see subsection 3.1.2.18);   – a head of cylinders and pushers (see subsection 3.1.1.11 and subsection 3.1.1.9);   – cam-shafts (see subsection 3.1.1.9);   – the oil pump (see subsection 3.1.1.13);   – a gear belt and gear wheels of a belt, a cover of a gear belt (see subsection 3.1.1.6);   – a maslopriyemnik (see subsection 3.1.1.12);   – the oil pallet see subsection 3.1.1.12);   – soaking-up and final collectors (see subsection 3.1.1.4 and subsection 3.1.1.5);   – a cover of a head of the block of cylinders (see subsection 3.1.1.3);   – a flywheel (a leading disk of the hydrotransformer) (see subsection 3.1.1.14);  |